How To Choose A HVAC Contractor
Google
 
Skip Navigation Links > Rooftop Replacement Overview
Skip Navigation Links
Home Page
Choosing A Contractor
Service BasicsExpand Service Basics
Pictures
Installation BasicsExpand Installation Basics
Rooftop Replacement Overview
Contact Me
Blog
About Me


FAVORITE

LINKS

F and G Mechanical

F and G Mechanical


UA Local 274

Local 274

International Wastewater
Systems

International Wastewater Systems



<May 2008>
SuMoTuWeThFrSa
27282930123
45678910
11121314151617
18192021222324
25262728293031
1234567

Replacing A Rooftop Unit

  A overview of a rooftop replacement

  1. Call manufacturer and find out lead time of unit and curb adapter.

  2. Once unit and adapter is available, schedule crane.

The following should take place the day before or the morning of crane pick.

  1. Cone off area where crane will pick from.

  2. Locate units power source (breaker panel).

  3. Lockout/Tagout breaker and gas valve.

  4. Reclaim Refrigerant from unit.

  5. Disconnect Unit from power and gas.

  6. Disconnect Control wiring and write down colors used and terminal locations.

  7. Check to see if units ductwork is screwed to unit or curb. Support duct and remove screws if necessary.

  8. Help crane set up when he gets there.

  9. Position truck with new rooftop and curb for crane.

  10. Remove old rooftop unit from rooftop.

  11. Clean top rail of existing roof curb and apply new foam tape. Inspect condition of roofing and ducts.

  12. Crane up and install adapter curb.

  13. Apply foam tape to top of curb adapter, and inspect seal between existing curb and adapter.

  14. Crane up new Rooftop unit and hook up electric and gas pipe.

  15. Follow manufactures start up procedure, and inspect all of units components.

The End!


 